Don’t miss out on the chance to save money with the limited-time special offer included in our October PMXpert Connection!
For a limited time, PMXpert Software is offering the PMXWeb Module at a discounted price of 25% Off - that's a savings of almost $500.00! But hurry, this offer expires October 31, 2009. To take advantage of this offer, contact our Sales Department today at (306) 975-3737 or Sales@PMXpert.com with this Promotion Code: PMXNL0910(must be quoted to receive discount offer).
This promotion only applies to current clients who have already purchased the software. It cannot be applied retroactively to previous purchases. It does not have cash value and cannot be combined with any other promotion or discount offer. No substitutions or transfer rights will be given.
To download the latest Software Update, which includes the New Features, Enhancements and Fixes listed below, log in to PMXpert Support. Click on the Downloads tab and click on the PMXpert V10.6 (10.6.0.352) link.
Remember that Software Updates are only available to customers with a current Upgrade Protection Plan. If your Upgrade Protection Plan has lapsed, contact our Sales Department at Sales@PMXpert.com or (306) 975-3737 (Press 1). They can provide you with information on how to reactivate your Upgrade Protection Plan so that you can continue to get the maximum advantage out of your PMXpert Software investment.
New Features
Version 10.6.0.350
Added Attachment tabs to the Work Order and Purchase Order areas and the corresponding rights to the User Rights area
Added an Asset Multi Edit to the Asset area of the program
Added a ‘Show group totals only’ option to the ‘Costing Summary by Asset report’
Added the ability to add a request to an existing Work Order (Either creating a new service or add to an existing service under that Work Order)
Added a ‘Asset Downtime’ pipeline to the ‘Service History’ report that totals the downtime for each Work Order Service
Enhancements
Version 10.6.0.350
Added a ‘Make’ field to the Asset edit
Added a Purchase Order tab under the Asset History to show all the purchase orders that contain items purchased for the asset
Added a ‘Copy Attachments’ option to the Asset – Attachment area
Added ‘AddressBookLabor’ and ‘AddressBookLaborSecond’ pipelines to the ‘Asset List’ report
When creating a Work Order from an Asset Request, the description field will populate with the request’s description and be available for editing
Added the ‘Last Cost’ field to the Inventory grid
Added a ‘When closing a Work Order Service, require all procedures to be completed’ option to ensure all work order procedures are closed before closing a Work Order
Added a ‘Print open services only’ option to the ‘Work Order’ report
Added a 'Request' pipeline to the ‘Work Order List’ report
When adding a detail to a Purchase Order, the program will prompt to add to the Asset’s part/fluid list if it is not already there
Added ‘FluidCost’, ‘LaborCost’, ‘PartCost’, and ‘OtherCost’ fields to the the ‘Work Order Service List’ report
Added a ‘Required By’ field to the PurchaseOrderDetail table, now each Purchase Order Detail item can have its own required by date
Added ‘LocationName’ field to the 'Asset' pipeline on the ‘Work Order Service’ report
Added system setting to allow the creation of attachment type procedures when adding requests to Work Orders
Added the ability to pick the number of meter history, warranty history, and location history records to be displayed on the ‘Asset Snapshot’ report
Added the ability to define custom colors for status codes
Fixes
Version 10.6.0.352
Statuses were missing from the ‘Work Order Find’ status filter
Error occurring when printing a ‘Work Order’ report from the Request screen
Users that did not have ‘Asset Modify’ rights could multi edit Assets
Version 10.6.0.351
Error occurring when posting costing entries
Error occurring when adding an attachment to an asset in the Asset edit form
Version 10.6.0.350
When changing a User’s usercode, the change wasn’t reflected in the PMXpertUser field under the labor tab of a person
When editing a Work Order Service detail record and changing the part/fluid to a different part/fluid, it was not updating the old part/fluid correctly
Purchase Order totals were not consistent between the Purchase Order grid, the authorization form and the received form
When receiving a Purchase Order, the total at the end of the wizard was totaling the whole Purchase Order, not just the received items
When entering a request manually, and selecting the ‘Received From’, the ‘Email’ field was not populating properly in alerts not working in some cases
The system setting for the generated work order prefix was being overwritten when entering a different prefix during the generation of a Work Order from the PM Schedule screen
Version 10.5.1.336
When closing a Work Order with open Work Order Services, detail records linked to the service were not being deleted, resulting in orphaned records
Error occurring when checking for requests and an email had a .msg or .eml attachment
When rescheduling a meter from the PM Schedule the resulting scheduled date was incorrect in some cases
The ‘Printed By’ and ‘Printed On’ fields on a Work Order were being updated even if you were designing the ‘Work Order’ report
Purchase Order totals were not consistent between the Purchase Order grid, the authorization form and the received form
When using the ‘Import Inventory Detail’ option for a Work Order, the quantity items were being incorrectly imported